Bixby Energy MaxFire Operations Instructions

Browse online or download Operations Instructions for Space heaters Bixby Energy MaxFire. Bixby Energy MaxFire Operating instructions User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 40
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Installation, Operating and
Maintenance Instructions
UBB
Multi-Fuel Stove
WARNING! PLEASE READ THIS ENTIRE MANUAL BEFORE INSTALLATION AND USE OF THE BIXBY UBB MULTI-
FUEL STOVE. FAILURE TO FOLLOW THESE INSTRUCTIONS COULD RESULT IN PROPERTY DAMAGE, BODILY
INJURY OR EVEN DEATH. CONTACT LOCAL BUILDING OFFICIALS, FIRE OFFICIALS OR THE AUTHORITY
HAVING JURISDICTION ABOUT RESTRICTIONS, PERMITS AND INSTALLATION INSPECTION REQUIREMENTS
IN YOUR AREA.
Save these instructions for future reference.
PLEASE RECORD THE FOLLOWING INFORMATION:
MODEL _______________ DEALERSHIP ______________ INSTALLER _______________
DATE PURCHASED _______________ DEALER PHONE ______________ INSTALLER PHONE _______________
SERIAL NUMBER ____________________________


2056754 REV B
10/29/2007
Page view 0
1 2 3 4 5 6 ... 39 40

Summary of Contents

Page 1 - Multi-Fuel Stove

Installation, Operating and Maintenance InstructionsUBB™ Multi-Fuel StoveWARNING! PLEASE READ THIS ENTIRE MANUAL BEFORE INSTALLATION AND USE OF THE BI

Page 2 - TABLE OF CONTENTS

10Bixby Energy Direct Vent Pipe is listed by OMNI-Test Laboratories, Inc. as the venting system for Bixby Energy pellet and corn

Page 3 - SAFETY INFORMATION

11The use of pelletized fuel does not eliminate the need for inspection and cleaning. During the heating season, inspect

Page 4 - Floor Protector

12When exiting through walls, make sure NFPA rules are followed for distance from windows and openings. The termination cap will be

Page 5 - SPECIFICATIONS

13Where passage through a wall or partition of combustible construction is desired, the installation shall conform to CAN/CSA-B36

Page 6 - 

14The allowable venting configuration is to be 25 equivalent horizontal feet (7.5 m) or less as determined through the follo

Page 7 - PLANNING THE INSTALLATION

15Follow the UBB manufacturer’s instructions and safety manual for maximum efficiency and safety. Connect only BI

Page 8 - 

16The vent connection is on the back of the UBB (see Figure 8). If vertical interior installation is desired:NOTE: Ver

Page 9 -  

17The vent connection is on the back of the UBB (see Figure 8). If a horizontal through-the-wa

Page 10 - 

18For installation into a sloped ceiling, the Cathedral Ceiling Support Box is to be used as the fire stop. Follow

Page 11 - Usable length of

198. Place the Vertical Support Clamp (5000576), around the top of the hole in the bottom of the Supp

Page 12 - 

2TABLE OF CONTENTSSafety Information 3Minimum Clearances to Combustible MaterialsSpecifications 5Mobile Home InstallationPlanning the Installation 7

Page 13 - 

20• Open the hopper lid and fill the hopper with fuel. • See Specifications (page 5) for fuel recommendations.• The UBB is configured to bur

Page 14 - 

211. Open the Fuel Hopper Door on the top of the Bixby Energy UBB and fill the hopper with corn, biomass pellet fuel, or a Bixby Energy approved alte

Page 15 - 

22SPAREEXHAUSTFEEDCONVECTIONFANASH DUMPFREQUENCYFUELMIXAB01020-10-2001020-10-201x1/2x4xBIX CHECKRS-232THERMOSTATCONNECTION2052009 REV C16x30-30-30308

Page 16 - 

23FINE TUNING THE UBBThe UBB comes from the factory with the following trim pot knob presets: • Exhaust Fan: +/- 0 • Feed Rate: +/- 0 • Ash Dump

Page 17 - 

24FINE TUNING THE UBB (CONT.)• Flame is oscillating from low flame height to high flame height ov

Page 18 - 

25FINE TUNING THE UBB (CONT.)The UBB performs an ash dump according to the amount of fuel that has been fed. At the time of an ash d

Page 19 - 

26MAINTENANCE AND CLEANING PROCEDURESThe UBB has been designed to reduce the frequency of cleaning. However, if the simple maintenance tasks detailed

Page 20 - OPERATING INSTRUCTIONS

27Ash DrawerFly ash and other deposits will accumulate on the Heat Exchanger Tubes over time and will act to ins

Page 21 - 

28The Exhaust Manifold should be cleared on a monthly basis to ensure proper air flow in the UBB.1. Tu

Page 22 - CONTROL BOARD TRIM POT PANEL

29The Fuel Hopper should be cleaned on a regular basis (monthly) to remove fines (dust and small pieces of fuel) and ensure proper

Page 23 - FINE TUNING THE UBB

3SAFETY INFORMATION1. Install and use only in accordance with these installation and operating instructions, beginning page 10. Contact local buildi

Page 24 - FINE TUNING THE UBB (CONT.)

30The Lower Paddle needs to be cleaned once a month in order to operate efficiently. The ash dumping process causes

Page 25

31The 8 heat level indicator lights on the UBB are also designed to act as potential problem indicators. Whenever one or more of these lights begins

Page 26 - 

32TROUBLESHOOTING PROCEDURESWhen experiencing a problem, please read through the following list to determine which item most closely approxima

Page 27

33 Fire fails to start. Be sure enough fuel is in the burn pot. Fuel should cover the bottom to a level

Page 28 - 

34 Burn drive motor does not operate. Confirm firebox door is closed and door switch is fully engaged.Confirm ash drawer is

Page 29 - 

35THIS PAGE INTENTIONALLY LEFT BLANK

Page 30 - Burn Pot

36SERVICE PARTS LIST124356781011122418192021221417161315239

Page 31

371 SENSOR, FEEDER WHEEL2 MOTOR, FEEDER WHEEL3 CONVECTION FAN ASSEMBLY4 CONTROL BOARD TRIM POT PANEL5 MOTOR, BURN DRIVE6 AIR PUM

Page 32 - TROUBLESHOOTING PROCEDURES

38POWER INLETFRONT PANELBURN DRIVE MOTORPURPLEYELLOWPINKSPACE - UNUSEDFIRE DOOR SWITCHASH DRAWER SWITCHHOPPER DOOR SWITCHBURN DRIVE HOME POSITION SWIT

Page 33 - TROUBLESHOOTING CONT

39Description Color / Size Part #Termination Cap Stainless 5002506 Wall Thimble Aluminized Steel 5000526 Horizontal Flashing Kit Stainless Steel 50010

Page 34

4Use a non-combustible floor protector under the unit, extending 6” (150mm) past the side of unit (or less

Page 35

40Date Service Performed NotesMAINTENANCE LOG

Page 36 - SERVICE PARTS LIST

5SPECIFICATIONS: Corn:• Dry shelled corn, 16% moisture or less. Corn that is greater than 16% can generate mold in the hopper

Page 37 - OPTIONAL ACCESSORIES

6IMPORTANT: Proper material handling equipment must be available to safely transport and position the Bixby UBB.1. The UBB is attached to the pallet

Page 38 - WIRING DIAGRAM

7The unit is shipped completely assembled. It is enclosed in protective packaging material and attached to a shipping

Page 39 - VENTING PARTS LIST

8The UBB is designed so that it can be operated by a wall mounted thermostat. Any “on/off” 24V AC wall mounted thermosta

Page 40 - MAINTENANCE LOG

9  

Comments to this Manuals

No comments